Judd Road Bridge Reconstruction

The contractor for the Judd Road Bridge reconstruction will be starting construction on 9/15/2025.  Contract timeline for the proposed project will extend to the Fall of 2026.  The project is a joint project between the Town of Monroe and the Town of Easton.  The Project is being 100% funded through the LOTCIP Program.

During construction the road will be closed to traffic as the bridge is being reconstructed.  Please follow the detour plan provided in the link below. Detour is to bypass the road closure by following Route 25 to Route 59.

Detour Route

Questions and/or comments may be directed to the Town Engineer, James DiMeo at 203-452-2814.